Defence Industry

Import of Key Technologies: Need to revisit policy
Star Rating Loader Please wait...
Issue Vol 26.2 Apr-Jun 2011 | Date : 02 Jul , 2011

Inaugurating a three-day international seminar on aerospace technologies in Bengaluru on 07 February 2011, Defence Minister Antony admitted that India had not benefitted much from the technologies transferred to it in the past. It was a candid admission of the failure of the procurement regime to ensure infusion of meaningful technologies and accretion of desired benefits to the Indian industry.

Click for IDR Subscription

India has been obtaining technologies under ‘Buy and Make’ route wherein a limited quantity is purchased from a foreign vendor in fully built condition and the bulk quantity is manufactured in India under licence through transfer of technology (ToT). Despite the fact that India has been following this route for decades for all large scale purchases like tanks (T-55, T-72 and T-90) and aircraft (MiG series, Jaguar, Sukhoi and Hawk), no genuine and substantial technology has been transferred to India. Worse, foreign vendors have been charging India hefty amounts for allowing licensed production.

Indian policy makers have been using the term ToT in a highly misleading manner. Under the taxonomy of ToT, they have been seeking know-how to assemble systems in India. Whereas technology implies total know-how for product manufacture from component level, indigenous production remains limited to assembling of sub-assemblies.

‘Technology’ is one of the most commonly used yet variously interpreted terms. Although a number of definitions exist, the World Intellectual Property Organisation provides the most comprehensive definition. According to it, technology pertaining to industrial production is ‘systematic knowledge for product manufacture and service provision’. There are two vital components of the definition. One, it is knowledge that is systematic in its evolution, delineation and description. It is only then that it can be intelligently implemented and purposefully exploited. Two, it should facilitate product manufacture and service provision. For that it must cover the complete gamut to include engineering and manufacturing details for fabrication, assembly, test and maintenance.

As seen above, technology is knowledge that is all-inclusive and fully caters for all requirements for product manufacture. There can be no gaps in the knowledge that may impede implementation. Although knowledge is essentially an intangible attribute, when transformed into technology it becomes a tangible asset. Therefore, conversion of knowledge into technology entails preparation of engineering and manufacturing documentation to enable production of the article from component level and its subsequent operation and maintenance.

ToT under ‘Buy and Make’ Procedure

As every product entails integration of multiple sub-systems, every technology package consists of a number of sub-technologies. Therefore, negotiation of technology for the manufacture of a defence system/product has to factor in all sub-technologies that go into it.

Unfortunately, Indian policy makers have been using the term ToT in a highly misleading manner. Under the taxonomy of ToT, they have been seeking know-how to assemble systems in India. Whereas technology implies total know-how for product manufacture from component level, indigenous production remains limited to assembling of sub-assemblies to deliver fully built units to the services. Worse, Original Equipment Manufacturer (OEM) retains exclusive right to supply sub-assemblies.

“¦not a single imported technology during the last three decades has provided a springboard for the development of superior technologies testifies the total failure of the current dispensation.

Although the Defence Procurement Procedure (DPP) provides detailed guidelines under ‘Buy and Make’ procedure, these have been evolved purely to cater to the interests of public sector entities who are always nominated as Indian recipients. DPP delineates the following four phases for indigenous production:-

  • Phase 0 – Receipt of fully assembled and tested product from OEM.
  • Phase 1 – Receipt of ‘Semi Knocked Down’ (SKD) kits provided by OEM. Kits to consist of sub-systems, assemblies, sub-assemblies and modules assembled and tested by OEM and/or his vendors/sub-contractors. Recipient to carry out final assembly and testing of the product.
  • Phase 2 – Receipt of ‘Completely Knocked Down’ (CKD) kits provided by OEM in the form of unassembled Bill of Materials. CKD kit may include certain components/sub-assemblies available ‘Commercially Off The Shelf’ (COTS) from multiple vendors as fully finished items. Recipient to carry out assembly and test of individual PCBs/modules/sub-assemblies/assemblies/sub-systems from component level and then carry out final assembly and testing of the product.
  • Phase 3 – Shall be based on supply of proprietary items as Indigenous Manufacture (IM) kit by OEM. Recipient to procure all components or raw materials and carry out complete fabrication, assembly and testing of the product.

As can be seen, Phase 0 entails outright purchase of fully built product and it is incorrect to count it as a stage in ToT process. Similarly, Phase 1 relates more to screw-driver technology of assembling major sub-assemblies and means little in terms of infusion of technology. Even Phase 2 has limited value as regards ToT unless it culminates in Phase 3. It is only in Phase 3 that a recipient receives detailed know-how through engineering and manufacturing documentation to enable production from component level.

Unfortunately, in all deals concluded by India under ‘Buy and Make’ procedure, Phase 3 is never reached. At best, indigenous manufacture is restricted to assembly under Phase 2. This arrangement suits both OEM and public sector units ideally. OEM does not transfer any know-how but keeps getting orders for continued supply of sub-assemblies and critical components. Concomitantly, public sector units remain assured of confirmed orders from the services and earn huge profits without any sweat. Apparently, no meaningful technology is sought and obtained. The fact that not a single imported technology during the last three decades has provided a springboard for the development of superior technologies testifies the total failure of the current dispensation. This is the prime lacuna of seeking technologies under ‘Buy and Make’ procedure.

Analysis of Range, Depth and Scope of Technology on Offer

For effective negotiation of ToT, it is essential to break down the overall technology package into sub-technologies to ascertain true range, depth and scope of technology being offered. Therefore, DPP mandates that OEM should be asked to identify each item (system/sub-system/assembly/sub-assembly/module/part) in the product structure under the following five categories:-

It has been seen that every single ToT contract signed by India runs into trouble and it is always India whose interests suffer. Indian negotiators consider drafting of contracts to be drudgery”¦

  • Category 1. Items for which complete technology to enable the recipient carryout fabrication, assembly and test of the item is being provided by OEM. Such items should be classified under the head ‘Complete Transfer of Technology’ or C-ToT.
  • Category 2. Items which are manufactured by OEM’s sub-contractors based on the engineering documentation provided by OEM and the said documentation is made available to the recipient. Such items should also be classified as C-ToT.
  • Category 3. Items whose development and manufacture has been sub-contracted by OEM to his vendors/sub-contractors based on the procurement drawings/specifications provided by OEM. Apparently, OEM can only provide the same drawings/specifications to the Indian recipient and nothing else. For the purposes of evaluating the depth of technology being transferred, it should be presumed that the technology in respect of such items is not provided. In case OEM, in collaboration with his vendor/sub-contractor, is able to provide maintenance documentation and training, the items should be classified under the head ‘Limited ToT for Maintenance Support’ or M-ToT.
  • Category 4. Items sourced by OEM against his procurement specifications as ‘Fully Finished’, may be considered as bought-out. OEM will only be able to provide the procurement specifications and the sources of supply to ensure availability during the life cycle of the product. In case OEM, in collaboration with his vendor, is able to provide documentation for maintenance and training, such items should also be classified under the head M-ToT.
  • Category 5. Items for which OEM is not willing to transfer technology (despite having the ownership of design and manufacturing documentation) should be classified as ‘Proprietary’ items. These items are generally not included in the scope of ToT. Needless to say, the list of such items should be as small as possible.

Further, DPP stipulates that OEM not offering the key specified technologies under C-ToT (categories 1 and 2) and maintenance technologies under M-ToT (category 3 single source vendor assemblies) should not be considered for ‘Buy and Make’ order.

Cost-wise_ToT

Value Addition

As ToT has to result in indigenous production and carries a cost penalty, it is equally essential to procure cost-wise breakdown of various categories of items from OEM. It is only then that true extent of value addition can be commuted. DPP provides guidelines as regards limits of relative percentages both for CKD kit and IM kit based ToT. These have been shown below in a tabulated form.

Editor’s Pick

DPP further stipulates that no item which is critical either from the technology point of view or which constitutes a significant relative percentage of the product cost (say>10%) should be accepted as a ’Proprietary’ item. In addition, no single item, which constitutes more than 10 percent of the cost of the product, should be kept outside the scope of ToT. In case such an item belongs to the ‘bought out’ category, OEM should bid in consortium with the concerned sub-contractor/vendor for ToT assurance.

Finally, depth of technology should enable the recipient to achieve value addition of a minimum of 60 percent of the relative cost of the licensed product through indigenous manufacture. Undoubtedly, the exact percentage of value addition would vary based on the product. Unfortunately, no records are made available in public domain to indicate details of value addition achieved at various stages of indigenous production under licence.

Negotiating ToT Contracts

India_Defence_ReviewIt has been seen that every single ToT contract signed by India runs into trouble and it is always India whose interests suffer. Indian negotiators consider drafting of contracts to be drudgery and prefer to ask foreign OEM for draft contracts. Needless to say, draft contracts are always loaded in their favour. Perfunctory scrutiny is carried out by Indian officials for major issues. Small print that escapes Indian notice invariably proves detrimental at a later stage.Although DPP lays considerable stress on the details to be included in the contracts, Indian negotiators generally fail to ensure compliance. Failure to negotiate a fool-proof contract results in multiple interpretations of its provisions during the implementation stage and causes bad blood due to frequent squabbling and legal wrangles.

Click for IDR Subscription

The contract should be comprehensive and all-inclusive. There should be no loopholes which an insincere OEM can exploit to renege from contractual obligations. As recommended by DPP, special attention should be paid to the following aspects by the contract negotiating team to safeguard Indian interests:-

ToT must fill critical gaps in indigenous knowledge and help accelerate the process of achieving self reliance. Therefore, its selection should be need-based and not availability-based.

  • Supply of Required Documentation. All documents should be sought in English to obviate time penalty and misunderstandings in translation. The documentation should be the one used by OEM or his sub-contractors for the purpose of manufacturing, assembly and testing of the product in their plant. It should be exhaustive enough to enable the recipient to manufacture, assemble, test, install and commission, maintain and overhaul the product. Wherever approval of certification agency is relevant, it should also be provided.
  • Product Upgrades. An undertaking should be obtained from OEM with regard to provision of technical data and Configuration Control Documents in respect of any modifications, improvements and upgrades undertaken by it during the entire life cycle of the product, at no additional cost. All updates during the currency of the contract should be provided as and when issued free of cost. A consolidated list of all updates during the year should also be provided during the first quarter of the subsequent year.
  • Training. Comprehensive industrial training should be provided to the recipient in English language, both in classrooms and on-the-job. It should cover all aspects of design, manufacture, software, system integration, installation and commissioning. Training for testing and component level maintenance is equally important.
  • Technical Assistance. The recipient of technology should be assured of technical assistance by OEM and his sub-contractors during various phases of the manufacturing programme. Such assistance should be mentioned in the contract in terms of man-weeks spread over a number of missions. In addition, it should be obligatory for OEM to provide answers to all questions raised by the recipient in an honest, detailed and expeditious manner, at no extra cost.
  • Provision of Special Maintenance Tools and Test Equipment. Complete technical data of all Special Maintenance Tools (SMTs) and Special Test Equipment (STEs) used in the production, assembly, test and maintenance of product should be provided. Data for manufacture and maintenance of such SMTs and STEs along with their calibration details should also be made available. Wherever software is used, details of the software including Source Code and Firmware Support Manual for embedded software must be provided.
  • Product Support. OEM must assure complete product support including supply of spares and management of obsolescence for the specified period. At any stage during the life cycle of the product, if the OEM intends to discontinue the production of Proprietary items, the complete technical documentation in respect of these items available with OEM or his sub-contractors should be provided to the recipient to enable him to develop alternate sources. List of consumables required for the manufacture/maintenance of product along with cost, source details and life data should also be provided. As regards special technologies, special coatings and treating processes of specific components/assemblies, the contract must make it obligatory for OEM to provide their details. OEM should also undertake to assist the recipient obtain all possible support for M-ToT from his vendors/sub-contractors.

“¦the concept of ToT under “˜Buy and Make needs to be revisited. Production based on SKD and CKD kits should be excluded from the ambit of ToT.

  • Delivery Schedule. Complete schedule for transfer of documentation, provision of industrial training, technical assistance, supply of kits, spares, SMTs, STEs, tools, jigs and fixtures must be included in the contract. Default must attract claims for liquidated damages.
  • Development of Local Vendors. The recipient should be at liberty to develop local vendors and sub-contractors for the supply of components and sub-assemblies. No provision should bind the recipient to procure such items from OEM alone.
  • Warranty. OEM should provide warranty both with respect to documentation and the material. Documentation supplied must be identical, complete and of equal quality as the documentation used by OEM for his own activities. Similarly, items supplied should be free from any defects arising from faulty material, design or workmanship and should be guaranteed for quality. OEM should also guarantee the performance of the product to design specifications.

Essentials of a Successful ToT Agreement

A successful ToT depends on four essentials – careful identification of technology for import, selection of reliable OEM, objective nomination of recipient and close oversight of technology absorption. ToT must fill critical gaps in indigenous knowledge and help accelerate the process of achieving self reliance. Therefore, its selection should be need-based and not availability-based. Further, technology should be of the latest genre with multiple applications.

It is essential that India selects its negotiating team with due diligence. The current practice of nominating representatives of different agencies must be replaced by nomination of duly trained officials who are well equipped to understand complexities of ToT process.

Selection of suitable OEM is the key to successful implementation of a ToT contract. In addition to his capability to transfer the necessary know-how, OEM should have a track record of honest and diligent adherence to contractual obligations. Unreliable and unscrupulous OEM must be conscientiously avoided. It should also be made certain that there are no strings attached to the said technology as regards its unrestricted use by the recipient.

Once a technology package is broken down into sub-technologies and duly categorised, a market scan should be carried out to identify the entity (private or public sector) most suited to receive and absorb incremental sub-technologies to be able to produce the equipment. Such a course of action will not only cost least but will also expedite indigenous production. Unless fully absorbed and mastered, ToT can prove highly wasteful. Therefore, it is absolutely imperative that the complete process of transfer and absorption is closely monitored by an independent agency.

The Way Forward

Genuine ToT implies transfer of know-how to enable the recipient to produce equipment from component and raw material level. ‘Buy and Make’ has reduced ToT to screwdriver competence. No wonder that ‘Buy and Make’ procedure has totally failed to raise threshold of Indian technological proficiency – ToT is a pretense used by the public sector units to grab orders without competitive bidding and to perpetuate their monopoly.

Worse, the current dispensation has spawned a culture of complacency and lassitude amongst the public sector units. Instead of striving to imbibe new technologies, they are happy to assemble products from sub-assemblies supplied by foreign manufacturers. These are then passed on to the needy services as indigenously produced equipment at a huge profit. There cannot be a bigger travesty of truth. Therefore, the concept of ToT under ‘Buy and Make’ needs to be revisited. Production based on SKD and CKD kits should be excluded from the ambit of ToT.

As OEM is always more knowledgeable about all aspects of his product and the criticality of sub-technologies involved, he is better placed to carry out negotiations. An unwary importer can easily be tricked by small print. For example, critical items and documentation can be deliberately kept out of negotiations by a shrewd OEM. Once the contract gets signed, he starts demanding additional money and the hapless recipient is coerced to incur extra expenditure. This is a standard subterfuge most OEM employ. India has constantly suffered on this account.

India_Defence_ReviewNegotiating ToT deals is by far the most intricate, multifaceted and painstaking task. The functionaries should be fully conversant with the dynamics of ToT practices in vogue in the international arms trade and be aware of the likely pitfalls. It is essential that India selects its negotiating team with due diligence. The current practice of nominating representatives of different agencies must be replaced by nomination of duly trained officials who are well equipped to understand complexities of ToT process. Infusion of technology must provide a platform for the development of higher level technologies, thus promoting self reliance in defence production and reducing dependence on foreign equipment.

Rate this Article
Star Rating Loader Please wait...
The views expressed are of the author and do not necessarily represent the opinions or policies of the Indian Defence Review.